Custom Clusters

Your AI factory, built to spec

We design, procure, build and operate physical GPU clusters from 8 to 4,096+ GPUs, on your premises or colocated in our renewable-powered data centers. You own the hardware. We make it run.

Free architecture consultation. Transparent bill of materials. Delivered in 4 to 24 weeks.

4,096+
GPUs per deployment, starting at 8
4-24 wk
From signed design to acceptance
0%
Markup on hardware: pass-through cost with the full bill of materials
24/7
Operations with a named engineer
Deployment options

Where your cluster lives is up to you

On-premises

We build inside your data center or server room. Includes site survey, power and cooling design, and any facility upgrades, managed end to end with your team.

Colocated at GREENAIBOX

Your hardware in our liquid-cooled, renewable-powered halls. Dedicated cage, private interconnect to your network, and power priced at our PPA rate.

Hybrid

Own a base cluster and burst to reserved GPU Clusters or on-demand instances on the same software stack, scheduler and storage namespace.

What we build

From a single HGX rack to NVL72 rows

Liquid-cooled HGX racks, NVL72-class rack-scale systems and the row-level cooling that keeps them at full clock, integrated and burned in before they reach your floor.

Reference configurations

Three starting points. Every build is bespoke.

Use these as a baseline for budgeting. Your design is sized to your workloads, facility and growth plan.

LabScaleFrontier
GPUs8 to 32 GPUs64 to 256 GPUs512 to 4,096+ GPUs
Nodes1 to 4x HGX H200 or B200 nodes8 to 32x HGX B200 nodes64 to 512x HGX B200 / B300 or GB200 NVL72 racks
Fabric400 Gb/s InfiniBand or 200 Gb/s RoCENon-blocking Quantum-2 InfiniBand fat treeRail-optimized Quantum-X800, 800 Gb/s
Storage100 to 500 TB all-NVMe1 to 5 PB parallel file system10+ PB, 1+ TB/s aggregate
Power15 to 60 kW120 to 480 kW1 to 10 MW
CoolingAir or rear-door heat exchangerDirect-to-chip liquid coolingLiquid cooling with facility water loop
Lead time4 to 6 weeks8 to 12 weeks12 to 24 weeks
Best forUniversity labs, R&D teams, fine-tuning and inferenceModel companies, enterprise AI platforms, multi-team clustersFoundation model pre-training, sovereign AI, national labs
Design a Lab clusterDesign a Scale clusterDesign a Frontier cluster
What we handle

From whiteboard to first training step

One team owns the whole project. No hand-offs between an integrator, a network vendor and a facilities contractor.

Start with a consultation
  1. 01

    Discovery and workload profiling

    Week 1

    We profile your models, data and growth plans, and survey your facility or select a colocation site. Output: requirements document and budget range.

  2. 02

    Architecture design

    Weeks 2 to 3

    Compute, fabric topology, storage tiers, power, cooling and software stack, with a transparent bill of materials and total cost of ownership model.

  3. 03

    Procurement

    Weeks 3 to 8

    GPU allocation secured through authorized distribution at pass-through pricing. We manage vendors, logistics and warranty registration.

  4. 04

    Build and burn-in

    Weeks 6 to 10

    Rack, cable, image and validate every node and link in our integration facility. 72-hour burn-in under real distributed training workloads.

  5. 05

    Deployment and acceptance

    Weeks 10 to 12

    Installation on site, fabric bring-up, storage and scheduler configuration, then an acceptance test against agreed benchmarks.

  6. 06

    Operations and lifecycle

    Ongoing

    24/7 monitoring, hardware replacement, firmware and software updates, capacity planning and quarterly reviews.

Component choices

Best-of-breed, vendor-neutral

We design for your workload, not for a vendor's quota.

Compute

  • NVIDIA HGX B300, B200, H200, H100
  • NVIDIA GB200 / GB300 NVL72 racks
  • AMD Instinct MI350 on request
  • CPU nodes for data processing

Networking

  • NVIDIA Quantum-2 and Quantum-X800 InfiniBand
  • NVIDIA Spectrum-X Ethernet
  • Rail-optimized, non-blocking topologies
  • Out-of-band management fabric

Storage

  • WEKA, VAST Data, DDN and Lustre
  • All-NVMe scratch tiers
  • S3-compatible object storage
  • Backup and cross-site replication

Cooling

  • Direct-to-chip liquid cooling
  • Rear-door heat exchangers
  • Immersion for dense deployments
  • CDU and facility loop integration

Power

  • Busway and PDU design to 130 kW per rack
  • UPS and generator sizing
  • Renewable PPA sourcing
  • Metering and carbon reporting

Software

  • GreenAI Stack images
  • Slurm, Kubernetes, Run:ai
  • Monitoring, alerting and logging
  • Identity, secrets and policy
Why build with us

Infrastructure people who also run infrastructure

Transparent pricing

Hardware at pass-through cost with the full bill of materials on the table. Our fee is for design, integration and operations, not markup.

Supply you can count on

Allocation for NVIDIA HGX and NVL72 systems is reserved at contract signing so your timeline doesn't slip.

Operated by the team that built it

The engineers who designed your cluster run it. Same runbooks, monitoring and software we use on our own fleet.

Flexible financing

Purchase outright, lease over 3 to 5 years, or structure as a managed service with a monthly fee. We work with your finance team.

FAQ

Frequently asked questions

Can't find what you need? Ask our team.

Who owns the hardware?

You do. We procure on your behalf with a transparent bill of materials and pass-through pricing, or you can purchase directly from our partners and have us integrate. Lease and financing options are available if you prefer to keep it off the balance sheet.

Can you build in our own data center?

Yes. We survey your facility for power, cooling and floor loading, design to what is available, and manage any upgrades with your facilities team. If your site cannot support the density, we colocate the cluster in one of our facilities and connect it privately to your network.

How long does a build take?

Lab-scale clusters (8 to 32 GPUs) take 4 to 6 weeks. Clusters of 64 to 256 GPUs take 8 to 12 weeks. Frontier-scale deployments take 12 to 24 weeks, driven mostly by GPU allocation and facility readiness. We reserve GPU supply at contract signing.

What does ongoing operations include?

24/7 monitoring, hardware replacement under warranty, firmware and driver lifecycle, scheduler and storage administration, security patching, capacity reporting and a named engineer. Operations contracts run 1 to 5 years and are priced per GPU per month.

What if we outgrow the cluster?

Every design leaves room in the fabric, power and storage for at least 2x growth. Adding nodes is a procurement and rack-and-stack exercise, not a redesign. We can also bridge with reserved GPU Clusters while new hardware ships.

Do you provide the ML engineers as well?

Yes. Managed Training can run on your cluster, so you can have us build the infrastructure and train the models on it while your team ramps up.

Get a cluster design in two weeks

Share your workloads, timeline and site. We'll return an architecture, a bill of materials and a total cost of ownership model, free of charge.